METHOD STATEMENT SETTING OUT WORK
Description of the Task/Activity: Setting Out Work
Key Plant and Tools Required: -Hoe -Wrench
Key Materials Required: -Wood
Other Essential Equipment: -Hoe -Barricade Tape -Stake
Specific Identified Residual Hazards: (or refer to the task specific risk assessment(s))
- Depth of Excavation Hole
- Danger of tripped and fall
- Wounded finger
- Hit by hammer
- Slashed by saw
Sequence of Operations:
(Specifying methods of
working, tools, materials and equipment utilized) Measuring Wood
Measuring peg made of wood, with the size 5 x 7 cm. embedded firmly into the ground as deep as 50 cm. The part that appears above ground level sufficient to provide an indication peil + 0,00 accordance drawing works, and above it is added to include the benchmark iron pipe height above peil + 0.00. Peg measure divided by 3:
1. Benchmarking measuring center line with red marks and sign by elevation as well as by red paint (pilox) with the code CL (Centerline).
2. Benchmark measuring bouwplank
3. Benchmark measuring buildings
(BOUWPLANK).
- Building boards with a size of thickness of 3 cm and a width of 15 cm, straight and planed flat on its upper side.
- Building board is installed on a wooden peg 5/7 with the distance from each is 1.50 m. Stuck in the ground so it can’t be moved or altered.
Building boards installed range 2.50 m. of the building’s AS the outermost or in accordance with current local.
Key Plant and Tools Required: -Hoe -Wrench
Key Materials Required: -Wood
Other Essential Equipment: -Hoe -Barricade Tape -Stake
Specific Identified Residual Hazards: (or refer to the task specific risk assessment(s))
- Depth of Excavation Hole
- Danger of tripped and fall
- Wounded finger
- Hit by hammer
- Slashed by saw
Sequence of Operations:
(Specifying methods of
working, tools, materials and equipment utilized) Measuring Wood
Measuring peg made of wood, with the size 5 x 7 cm. embedded firmly into the ground as deep as 50 cm. The part that appears above ground level sufficient to provide an indication peil + 0,00 accordance drawing works, and above it is added to include the benchmark iron pipe height above peil + 0.00. Peg measure divided by 3:
1. Benchmarking measuring center line with red marks and sign by elevation as well as by red paint (pilox) with the code CL (Centerline).
2. Benchmark measuring bouwplank
3. Benchmark measuring buildings
(BOUWPLANK).
- Building boards with a size of thickness of 3 cm and a width of 15 cm, straight and planed flat on its upper side.
- Building board is installed on a wooden peg 5/7 with the distance from each is 1.50 m. Stuck in the ground so it can’t be moved or altered.
Building boards installed range 2.50 m. of the building’s AS the outermost or in accordance with current local.

Barricade tapes are generally made from durable materials like polyethylene, polypropylene, or nylon, which ensure resilience in outdoor environments. The printing on these tapes uses fade-resistant inks to maintain visibility even under extreme sunlight and harsh weather conditions. Some high-end safety warning tape roll variants are even UV-resistant and flame-retardant, making them suitable for industrial settings.